The metric has come back 3.4 area units short, permission is due next month, and the biodiversity gain condition has to be discharged before anyone breaks ground. Buying the units to close that gap is simpler than most guides make it sound, as long as each step happens in the right order.

To buy biodiversity units, confirm your shortfall with the statutory biodiversity metric, then buy matching units from a gain site on the Biodiversity Gain Sites Register, ideally in your local planning authority (LPA) area. Once permission is granted, the allocation is recorded on the register, and the gain site reference goes into your Biodiversity Gain Plan.

Buying biodiversity units at a glance

Units are sold by landowners, habitat banks, brokers, trading platforms and some LPAs.

● You sign no section 106 agreement or covenant when the gain site is already registered.

● Recording the allocation costs £45, paid to Natural England.

● Natural England decides on the allocation within 6 weeks.

● The LPA decides on your Biodiversity Gain Plan within 8 weeks.

● If no units are available, the last resort is statutory biodiversity credits, from £42,000 per credit, with two credits needed for each unit.

What Is a Biodiversity Unit?

A biodiversity unit is the measure the statutory biodiversity metric uses to score habitat by size, distinctiveness, condition and strategic significance. Developers in England buy off-site units from a registered gain site to cover whatever their own site can't deliver towards the 10% Biodiversity Net Gain (BNG) required under the Environment Act 2021.

The metric counts three unit types separately

  • Area habitat

  • Hedgerow

  • Watercourse

They can't be swapped or added together, so a hedgerow shortfall needs hedgerow units even when you have spare grassland. Each type needs its own 10% gain.

Metric results rarely land on whole numbers. Many providers sell fractions of a unit, so a 2.37-unit gap means buying 2.37 units rather than three.

What Do You Need Before You Buy Biodiversity Units?

Before you buy biodiversity units, you need a completed statutory biodiversity metric showing the shortfall by unit type and habitat, and confirmation that BNG applies to the scheme. Without the metric, no seller can tell you which units match your losses or how many you need.

  • A metric completed by a competent person, usually an ecologist, with the final layout

  • The habitats being lost and their distinctiveness, which decide what can replace them

  • The development's LPA and National Character Area (NCA), which decide the multiplier

  • A check against the BNG exemptions, including the 0.2 hectare exemption

Major development must also show on-site options were explored before buying off-site. If you're still working out whether you need units at all, start with does my development need off-site biodiversity units, or read when to use off-site BNG.

Note on the 2026 rule changes

For planning applications made on or after 6 August 2026, sites of 0.2 hectares or less are exempt unless priority habitat is affected, and minor developments can go straight to off-site units. Major development still follows the full biodiversity gain hierarchy. BNG applies to Nationally Significant Infrastructure Projects (NSIPs) applying from 2 November 2026, adding demand for units.

The government also plans to measure spatial risk by Local Nature Recovery Strategy (LNRS) areas instead of LPA and NCA boundaries. It has no confirmed start date, so the current boundaries still apply.

Check GOV.UK for the rules on your application.

How to Buy Biodiversity Units, Step by Step

Buying biodiversity units follows seven steps, from confirming the shortfall to submitting the Biodiversity Gain Plan. You can reserve or pay for units before planning permission, but GOV.UK's off-site guidance sets a fixed order at the end. The allocation needs permission first, and the gain plan needs the allocation.

1. Confirm the Shortfall With the Statutory Biodiversity Metric

Your ecologist runs the statutory biodiversity metric on the final layout and records the gap in each unit type. Run it again once you've chosen a gain site, because the off-site location changes the numbers. The allocation application later needs the habitat ID of each allocated habitat from this metric.

2. Match Your Losses Under the Trading Rules

The metric's trading rules decide which habitats can replace your losses. Low distinctiveness losses can be replaced by the same distinctiveness or higher. Medium losses need the same broad habitat type or higher distinctiveness. High losses need the same habitat type, and very high losses usually need bespoke compensation agreed with the LPA. Once the losses are covered, the extra 10% can come from any habitat.

3. Choose a Location That Keeps the Multiplier at 1

The spatial risk multiplier discounts units bought away from your development. For area and hedgerow units, gains in the same LPA or NCA count in full, a neighbouring LPA or NCA counts at 0.75, and anywhere else in England counts at 0.5. Divide your shortfall by the multiplier to get the number of units to buy. A 5-unit shortfall means buying 5 units in the same LPA or NCA, 6.67 in a neighbouring one, or 10 anywhere else in England. Watercourse units follow catchment boundaries instead.

4. Find Units on a Registered Gain Site

You can buy units directly from a landowner, a habitat bank, a broker, a trading platform or, in some areas, your LPA. The Biodiversity Gain Sites Register, run by Natural England, records gain sites and allocations. It holds no seller contact details and isn't a marketplace, but you can use it to confirm a seller's site is registered and find its gain site reference.

A registered site has already been legally secured for at least 30 years by a section 106 agreement or conservation covenant, with a habitat management and monitoring plan (HMMP) in place. You don't need to secure it again. A gain site that isn't secured yet needs a section 106 agreement before your planning permission is granted.

5. Reserve, Agree the Price and Pay

Price and payment terms are agreed between you and the seller. Some providers take a deposit to reserve units, with the balance due on allocation, and GOV.UK lists lump sum, staged and results-based payment as options. Get written confirmation of the number and type of units, the gain site reference and a commitment to apply for the allocation once you've paid.

6. Record the Allocation on the Register

The allocation ties the units to your development so they can't be sold twice. The gain site's landowner, or you with the landowner's consent, applies to record the allocation with Natural England. The application needs your planning approval notice and the metric. It costs £45, and Natural England responds within 6 weeks.

7. Submit Your Biodiversity Gain Plan

The Biodiversity Gain Plan shows how the scheme reaches 10% and quotes the gain site reference for any off-site units. The LPA (Local Planning Authority) checks the units are registered and allocated, then has 8 weeks to approve or refuse the plan. Work can't start until it's approved, because the biodiversity gain condition is a pre-commencement condition. Natural England's 6 weeks and the LPA's 8 weeks can run back to back, so leave up to 14 weeks between permission and your start date.

Shortfall Confirmed and Ready to Buy?

Send us your metric summary and site location, and we'll tell you which units in our habitat banks match your habitat types and spatial position.

Match your metric to available units

Do You Sign a Legal Agreement When You Buy Biodiversity Units?

No, not when you buy from a registered gain site. The 30-year legal agreement, a section 106 agreement or conservation covenant, sits between the habitat bank and the LPA or a responsible body, and it has to be in place before the site can be registered. As the buyer, you're invoiced, you pay, and the units are allocated to your development.

You'd only need a section 106 agreement for off-site habitat that isn't legally secured yet, such as habitat you create on your own land outside the red line.

Responsibility moves with the purchase. The landowner is legally responsible for creating the habitat, managing it for at least 30 years and reporting on its condition. If habitat work hasn't started when you buy, it has to begin within 12 months of the allocation.

What You Receive When You Buy Biodiversity Units

● Invoice and proof of purchase, showing the number, type and habitat of the units bought

● Gain site reference number, which goes into your Biodiversity Gain Plan

● Allocation recorded on the register, which ties the units to your development so they can't be sold again

● Unit breakdown by habitat, so your ecologist can enter the off-site habitats and IDs in the metric

Who Does What When You Buy Units

  • Your ecologist runs the metric, confirms the shortfall and usually prepares the Biodiversity Gain Plan.

  • The habitat bank or landowner supplies matching units and manages the habitat for at least 30 years.

  • You, the developer, agree the purchase, pay, and submit the gain plan to discharge the condition.

  • Natural England runs the register and records the allocation.

  • The local planning authority approves the gain plan and enforces any section 106 agreement on the gain site.

When Should You Buy Biodiversity Units?

Start checking availability at the pre-application stage and reserve units before or alongside your planning application. The allocation can only be recorded after permission is granted, and the Biodiversity Gain Plan must be approved before work starts.

  1. Pre-application. Run an early metric and check local availability for your habitat types.

  2. Planning application. Submit the metric and BNG strategy, and reserve units if supply is tight.

  3. Permission granted. Pay the balance and apply to record the allocation, which takes up to 6 weeks.

  4. Before commencement. Submit the gain plan with the gain site reference. The LPA has up to 8 weeks to decide.

  5. Start on site. Begin work only once the gain plan is approved.

Supply is the main reason to move early. Units of the right habitat in the right LPA are finite, and NSIP applications made from 2 November 2026 will be buying from the same pool.

Checklist Before You Buy Biodiversity Units

Pre-purchase checklist

  • The metric is final and split by area, hedgerow and watercourse units

  • The units satisfy the trading rules for the habitats you're losing

  • The gain site is on the Biodiversity Gain Sites Register, and you have its reference

  • The location gives a multiplier of 1, or you've bought extra units to cover the discount

  • The seller confirms availability in writing and will apply for the allocation once you've paid

  • Your programme allows up to 14 weeks between permission and your start date

Buying Biodiversity Units From Habitat Banks West Midlands

Habitat Banks West Midlands creates and manages registered habitat banks in Staffordshire, selling woodland and grassland units rated medium, high or very high distinctiveness in the statutory metric.

Each site is listed with its LPA (Local Planning Authority) and NCA, such as Lichfield District and NCA 67 Cannock Chase and Cank Wood, so your ecologist can check the spatial position before you commit.

Buying from us follows the route above. You send your metric, we confirm which units match, you're invoiced and pay, and the units are allocated to your development with proof of purchase for your gain plan. Our high-distinctiveness woodland units can offset a wide range of losses within the trading rules, which helps developers across the region whose metric shows several habitat types.

Buy the Right Biodiversity Units Once

Buying units goes smoothly when the metric is final, the units match your losses, and the programme allows for allocation and gain plan approval. The costly mistakes are buying in the wrong place or the wrong habitat and having to top up later.

Send your metric summary and site location, and we'll come back with the units that fit your scheme and when they can be allocated.

See our available habitat banks

Get in touch

Frequently Asked Questions About Buying Biodiversity Units

Can I buy part of a biodiversity unit?

Yes. Metric results rarely land on whole numbers, and many providers sell fractions of a unit, so a 2.37-unit shortfall means buying 2.37 units. Statutory credits can also be bought in fractions to two decimal places. Check a provider's minimum purchase before assuming a small top-up is available.

Can I reserve biodiversity units before planning permission?

Yes. You can agree a purchase and pay a deposit before you apply, and GOV.UK allows units to be bought before, during or after a gain site's registration. The allocation waits for permission, because Natural England needs your planning approval notice to record it. Reserving early protects you if local supply of your habitat type runs short.

How long does it take to buy and allocate biodiversity units?

Agreeing a purchase from a registered habitat bank can take days. Recording the allocation takes up to 6 weeks at Natural England, and the LPA (Local Planning Authority) has up to 8 weeks to decide the Biodiversity Gain Plan. Allow up to 14 weeks between planning permission and starting on site.

What happens if the habitat on a gain site doesn't establish?

The obligation sits with the gain site's landowner, not the developer. The legal agreement makes the landowner responsible for creating the habitat and managing it to the condition set in the HMMP for at least 30 years, with monitoring reports to the LPA or responsible body.

Services

Connecting landowners and developers for biodiversity gains.

Support

Contact us

ecology@lwmts.co.uk

+44-1543 762233

© 2025. All rights reserved.